TES - Office & Industrial Energy Efficiency Services Schedule Free Audit.

About the Project

TES achieved $28K in Annual Energy Savings for Baltimore Medical Office Building. A targeted retro-commissioning scope identified five operational improvements across air handlers, controls, VFDs, duct static reset, and pump pressure optimization

233k

Yearly kWh Savings

$28k

Yearly Energy Cost Savings

These kinds of issues often stay invisible in day-to-day operations while driving avoidable energy use. The property included 13 AHUs across multiple floors and mechanical spaces, creating a wide operational footprint for inefficiencies to persist

Chemical cleaning of evaporators across AHU 1–13. Projected savings: 34,597 kWh/year and $4,152/year.

View Details

Repair faulty humidifier control and reduce discharge air humidity setpoints on AHU 1 and AHU 4. Projected savings: 33,925 kWh/year and $4,071/year

View Details

Troubleshoot/repair or replace the VFD on AHU 1 and return it to normal modulation based on static pressure and CFM demand. This was the single biggest savings measure: 129,118 kWh/year and $15,494/year.

View Details

Implement BAS programming and optimize static pressure setpoints on AHU 1 and AHU 4. Projected savings: 19,059 kWh/year and $2,287/year.

View Details

Reduce chilled water differential pressure setpoint to 9.7 psi for P-12 and P-13. Projected savings: 17,007 kWh/year and $2,041/year.

View Details

Schedule your free energy audit today!

We service commercial and industrial properties in all 50 states.

Schedule

TES vs Normal Mechanical Contractor

We Partner With Utilities Nation Wide to Fully Fund Energy Efficiency Projects

Other Contractor RCx Project

  • $11,500
    Energy Audit
  • $19,769
    HVAC Tune-Up
  • $16,000
    Repair Humidity Control
  • $45,000
    Repair VFD
  • $10,000
    Implement Duct Static Reset
  • $12,000
    Optimize Pump
  • Total:

    $114,269

TES RCx Project

  • $0
    Utility Funded Energy Audit
  • $0
    Utility Funded HVAC Tune-Up
  • $0
    Utility Funded Humidity Control Repair
  • $0
    Utility Funded Repair VFD
  • $0
    Utility Funded Duct Static Reset
  • $0
    Utility Funded Pump Optimization
  • Total:

    $0

Schedule Now